The Carbon Emissions Reduction Target (CERT) scheme ran between April 2008 and December 2012 following the Energy Efficiency Commitment 2005-2008. CERT placed a five year commitment on certain electricity and gas suppliers to reduce the carbon emissions within domestic properties.
The main aim of CERT was to contribute to the UK’s commitment to cut greenhouse gases by 12.5% by 2008-2012 under the Kyoto Protocol and Climate Change Act 2008. The overall target was for suppliers to achieve a saving of 293 million lifetime tonnes of carbon dioxide (Mt CO2) by 31 December 2012. By the end of CERT in December 2012, energy companies had achieved a saving of 296.9 Mt CO2 (Ofgem, 2013).
The CERT scheme was followed by The Gas and Electricity (Energy Companies Obligation) Order 2012 (the ECO).
[edit] Background
CERT was implemented by the Electricity and Gas (Carbon Emissions Reduction) Order 2008. Suppliers had to demonstrate that carbon dioxide (CO2) saving measures were being achieved through householders implementing energy efficiency measures.
The energy companies that were obliged to meet the reduction target were:
In addition to the carbon reduction target, the energy companies were required to meet the following three targets:
- At least 40% of the target had to be achieved through uptake by ‘Priority Group’ consumers. These were defined as those aged over 70 years of age or in receipt of certain income-related benefits.
- A saving of 16.2 Mt CO2 had to be met by promotion of energy efficient measures to the ‘Super Priority Group’ consumers. These were defined as those on certain qualifying benefits, for example households in receipt of child tax credits and under an income threshold.
- A saving of 73.4 Mt CO2 had to be met by promoting professionally installed insulation measures.
[edit] Delivery
Ofgem regulated the progress of CERT and reported that 3.9 million homes received professionally-installed loft insulation and 2.6 million households received cavity wall insulation. Other measures implemented included:
- Draught proofing and insulation.
- Shower regulators.
- Solar water heating.
- Small scale combined heat and power (CHP).
- Replacement boilers.
[edit] Scheme outcome
By end of the scheme in December 2012, the energy suppliers had achieved the following (Ref Ofgem, 2013):
- Savings of 296.9 Mt CO2 (equivalent to 101.3% of the overall CERT target). The main target required all the energy companies to meet their main obligations, but two failed and so the main target was not achieved.
- 41.3% of the overall carbon saving was from the Priority Group, against a target of 40%. The Priority Group target required that all energy companies had to meet their Priority Group obligations, but one did not so the target was not achieved.
- Saving of 16.6 Mt CO2 of carbon from the Super Priority Group, which is the equivalent of 102.6% of the 16.2 Mt CO2 target. In order to meet the Super Priority Group target, all energy companies had to meet their Super Priority Group obligations, but one did not so the Super Priority Group target was not met.
- Saving of 75.1 Mt CO2 of carbon (equivalent to 102.3% of the 73.4 Mt CO2 target) by installing measures eligible under the Insulation target. In order to meet the Insulation target, all energy companies had to meet their Insulation obligations, but two failed and so the Insulation target was not met
The majority of carbon saving was achieved through the installation of insulation measures (41%), with lighting measures accounting for 17.3%. Heating savings contributed 10%, appliances 5.9% and the remainder was split between microgeneration and CHP, behavioural measures and demonstration actions.
[edit] Related articles on Designing Buildings Wiki
- Carbon dioxide.
- Carbon emissions.
- Cavity wall insulation.
- Circular Construction in Regenerative Cities (CIRCuIT).
- Climate change act.
- Climate change levy.
- Combined heat and power.
- Green deal.
- Energy companies obligation.
- Insulation.
- Kyoto protocol.
[edit] External references
- The final report of the Carbon Emissions Reduction Target (CERT) 2008-2012, Ofgem 2013.
Featured articles and news
A now architectural practice looks back at its concept project for a sustainable oceanic settlement 25 years on.
Copyright and Artificial Intelligence
Government report and back track on copyright opt out for AI training but no clear preferred alternative as yet.
Embedding AI tools into architectural education
Beyond the render: LMU share how student led research is shaping the future of visualisation workflows.
Why document control still fails UK construction projects
A Chartered Quantity Surveyor explains what needs to change and how.
Inspiration for a new 2026 wave of Irish construction professionals.
New planning reforms and Warm Homes Bill
Take centre stage at UK Construction Week London.
A brief run down of changes intentions from April in an onwards.
Reslating an ancient water mill
A rare opportunity to record, study and repair early vernacular roofs.
CIOB Apprentice of the Year 2025/26
Construction apprentice from Lincoln Mia Owen wins this years title.
Insulation solutions with less waste for a circular economy
Rob Firman, Technical and Specification Manager, Polyfoam XPS explains.
Recycled waste plastic in construction
Hierarchy, prevention to disposal, plastic types and approaches.
UK Net Zero Carbon Buildings Standard V1 published
Free-to-access technical standard to enable robust proof of a decarbonising built environment.
Prostate Cancer Awareness Month
Why talking about prostate cancer matters in construction.
The Architectural Technology podcast: Where it's AT
Catch up for free, subscribe and share with your network.
The Association of Consultant Architects recap
A reintroduction and recap of ACA President; Patrick Inglis' Autumn update.
The Home Energy Model and its wrappers
From SAP to HEM, EPC for MEES and FHS assessment wrappers.
Future Homes Standard Essentials launched
Future Homes Hub launches new campaign to help sector prepare for the implementation of new building standards.
Building Safety recap February, 2026
Our regular run-down of key building safety related events of the month.